PRINCE2-AGILE-PRACTITIONER LATEST TEST DISCOUNT & PRINCE2-AGILE-PRACTITIONER PDF QUESTIONS

PRINCE2-Agile-Practitioner Latest Test Discount & PRINCE2-Agile-Practitioner PDF Questions

PRINCE2-Agile-Practitioner Latest Test Discount & PRINCE2-Agile-Practitioner PDF Questions

Blog Article

Tags: PRINCE2-Agile-Practitioner Latest Test Discount, PRINCE2-Agile-Practitioner PDF Questions, Valid PRINCE2-Agile-Practitioner Exam Labs, PRINCE2-Agile-Practitioner Practice Exams Free, PRINCE2-Agile-Practitioner Free Test Questions

Customers of UpdateDumps will also get up to 90 days of PRINCE2 Certified ICT Expert PRINCE2-Agile-Practitioner free real questions updates as a bonus perk. UpdateDumps not only provides the updated PRINCE2 PRINCE2-Agile-Practitioner practice questions but also offers these excellent offers that make them the best option in the market. Don't wait anymore. Buy UpdateDumps's PRINCE2 Agile Practitioner Project Management Exam (PRINCE2-Agile-Practitioner) updated practice material today!

Without self-assessment, you cannot ace the PRINCE2-Agile-Practitioner test. To ensure that you appear in the final PRINCE2 Agile Practitioner Project Management Exam (PRINCE2-Agile-Practitioner) examination without anxiety and mistakes, UpdateDumps offers desktop PRINCE2 PRINCE2-Agile-Practitioner Practice Test software and web-based PRINCE2-Agile-Practitioner practice exam. These PRINCE2-Agile-Practitioner practice tests are customizable, simulate the original PRINCE2-Agile-Practitioner exam scenario, and track your performance.

>> PRINCE2-Agile-Practitioner Latest Test Discount <<

PRINCE2-Agile-Practitioner PDF Questions & Valid PRINCE2-Agile-Practitioner Exam Labs

As we all know, a good PRINCE2-Agile-Practitioner Exam Torrent can win the support and fond of the customers, PRINCE2-Agile-Practitioner exam dumps of are just the product like this. With high pass rate and high quality, we have received good reputation in different countries in the world. We are a professional enterprise in this field, with rich experience and professional spirits, we have help many candidates pass the exam. What’s more, the free update is also provided.

PRINCE2 Agile Practitioner Project Management Exam Sample Questions (Q23-Q28):

NEW QUESTION # 23
Project scenario - Get fit with football!
(Note: The companies and people within the scenario are fictional)
Introduction
A Local Government Authority (LGA) has decided to organize a six-a-side football tournament. The tournament will contribute towards achieving the targets set by a national initiative to improve the fitness of children under the age of 16. As part of the LGA's policy of self-funding, this has to be achieved at zero cost to the LGA (and therefore the local tax payer). The cost of the event will be covered through fees paid by teams registered to take part in the tournament, sponsorship and monies raised during the day. Any surplus would be used for the maintenance of local sports centres.
Teams can register under one of several age groups for both boys and girls. In addition, family members are asked to attend to provide support.
This sports event is designed to be a family day out. The football tournament will have an event village including a kidz'-zone, catering, car parking, mobile changing rooms and toilets. The tournament will take place on the LGA-owned football pitches near the centre of the town, although space is somewhat limited.
Scope
The initial scope of the project includes:
a marketing campaign to promote the event;
a celebrity to open the event;
a website to provide information about the event and handle applications;
an event village to support the 'family day out';
the training of LGA staff as volunteers to run and support the event;
back-office processes to handle the applications;
fundraising to cover the cost of the event.
The project has been set up with four work streams to deliver this work:
1. Marketing
2. Website
3. Event Village
4. Staff Training
Project Background
The LGA have extensive experience in using PRINCE2 and will run the event as a single project. The project manager is fully conversant with PRINCE2 Agile. One office in the LGA building in the centre of town has been given to the project for the entire duration. The office is across the corridor from the Marketing Department and the project manager has already put a sign on the door that says 'Mission Control'.
Timeline
An initial timeline has been suggested and is shown in the following diagram. The timeline may evolve due to the agile ways of working. The timeline shows how work streams are broken down into work packages and/or timeboxes.

Staff Training - Additional information
The event will be supervised primarily by LGA staff volunteers. They will need to be trained in various skills so that:

  • A. the event is carried out safely and professionally;
  • B. The volunteers will take time to understand the training before they can apply it safely.
  • C. The health and safety training should be left out if it cannot be delivered before the football tournament.
  • D. staff members are able to give advice on health and fitness.
    This is covered by four work packages:
    1. Training syllabus:
    * High-level design of the manual.
    * Content of each module.
    2. Course content for safety and professionalism:
    * Detailed design of two modules:
    * Health and Safety including basic first aid.
    * Customer relations to look after people attending the event.
    * Piloting the modules with a group of volunteers.
    3. Course content tor giving advice on health and fitness:
    * Detailed design of two modules:
    * Exercise fundamentals including how to warm up and cool down.
    * Healthy eating including what types of food are good for you.
    * Piloting the modules with a group of volunteers.
    4. Training delivery:
    * Production of the training manual;
    * Delivery of the training to the rest of the volunteers.
    The Staff Training Team is staffed by in-house training staff members that have been involved in several waterfall projects but have not had any exposure to agile.
    Using the Project Scenario and Staff Training Additional information, answer the following question:
    The Staff Training Team have developed the following user story:
    'As the LGA, I want all volunteers to have received mandatory health and safety training so that we can ensure that the event takes place in a safe environment for the public.' Which reason explains why the team should deliver the user story in accordance with the 'be on time and hit deadlines' target?
  • E. The health and safety training must be delivered before the planned football tournament takes place.
  • F. The training must be delivered so that the volunteers understand the health and safety requirements.

Answer: D

Explanation:
Timely delivery of the health and safety training is crucial to ensure that all volunteers are adequately prepared before the event. Meeting this deadline is essential for ensuring a safe environment for the public during the football tournament, making it a priority to adhere to the schedule.


NEW QUESTION # 24
Project scenario - Get fit with football!
(Note: The companies and people within the scenario are fictional)
Introduction
A Local Government Authority (LGA) has decided to organize a six-a-side football tournament. The tournament will contribute towards achieving the targets set by a national initiative to improve the fitness of children under the age of 16. As part of the LGA's policy of self-funding, this has to be achieved at zero cost to the LGA (and therefore the local tax payer). The cost of the event will be covered through fees paid by teams registered to take part in the tournament, sponsorship and monies raised during the day. Any surplus would be used for the maintenance of local sports centres.
Teams can register under one of several age groups for both boys and girls. In addition, family members are asked to attend to provide support.
This sports event is designed to be a family day out. The football tournament will have an event village including a kidz'-zone, catering, car parking, mobile changing rooms and toilets. The tournament will take place on the LGA-owned football pitches near the centre of the town, although space is somewhat limited.
Scope
The initial scope of the project includes:
a marketing campaign to promote the event;
a celebrity to open the event;
a website to provide information about the event and handle applications;
an event village to support the 'family day out';
the training of LGA staff as volunteers to run and support the event;
back-office processes to handle the applications;
fundraising to cover the cost of the event.
The project has been set up with four work streams to deliver this work:
1. Marketing
2. Website
3. Event Village
4. Staff Training
Project Background
The LGA have extensive experience in using PRINCE2 and will run the event as a single project. The project manager is fully conversant with PRINCE2 Agile. One office in the LGA building in the centre of town has been given to the project for the entire duration. The office is across the corridor from the Marketing Department and the project manager has already put a sign on the door that says 'Mission Control'.
Timeline
An initial timeline has been suggested and is shown in the following diagram. The timeline may evolve due to the agile ways of working. The timeline shows how work streams are broken down into work packages and/or timeboxes.

Website - Additional information
A new website will be built for the event. There are five work packages within this product:
1. Initial homepage:
Website showing the event details, competition rules, etc.
2. Team Registration functionality:
team name, player's names and ages;
contact information;
payment;
lunch pack requirements (includes any special dietary needs);
car parking requirements.
3. Social media promoting the event and its aims.
4. Applications (apps) to promote healthy lifestyles including fitness and healthy eating apps.
5. Health Park:
An online knowledge base about healthy lifestyles that includes a discussion forum.
The Website Team have a lot of experience in IT and have been using agile for several years. They are delivering the website through five two-week timeboxes. The team uses a Scrum Master to facilitate and the Scrum process and coach people accordingly.
The Website Team are very good at Scrum. They have created a set of tasks to assess more difficult work and they refer to this as sprint zero.
Using the Project Scenario and Website Additional information, answer the following question:
The Scrum Master has been advised by the supplier subject matter expert that the five day task of building the social media website is now almost complete - there is just one more day's work to do.
How should this be shown on the burn-down chart?

  • A. The task should NOT be updated until the task has been completed.
  • B. The work remaining should be the difference between work completed and work left to be done.
  • C. The task should be marked as almost complete as there is less than one day's worth of effort left.
  • D. The task should be shown as 80% complete as there is only one day's worth of effort left.

Answer: D

Explanation:
The burn-down chart should reflect the current status of work remaining accurately. Since there is less than one day's worth of work left, marking the task as almost complete provides a clearer picture of progress and helps the team understand how much effort is needed to finish the task. This approach promotes transparency and effective tracking of progress.


NEW QUESTION # 25
Project scenario - Get fit with football!
(Note: The companies and people within the scenario are fictional)
Introduction
A Local Government Authority (LGA) has decided to organize a six-a-side football tournament. The tournament will contribute towards achieving the targets set by a national initiative to improve the fitness of children under the age of 16. As part of the LGA's policy of self-funding, this has to be achieved at zero cost to the LGA (and therefore the local tax payer). The cost of the event will be covered through fees paid by teams registered to take part in the tournament, sponsorship and monies raised during the day. Any surplus would be used for the maintenance of local sports centres.
Teams can register under one of several age groups for both boys and girls. In addition, family members are asked to attend to provide support.
This sports event is designed to be a family day out. The football tournament will have an event village including a kidz'-zone, catering, car parking, mobile changing rooms and toilets. The tournament will take place on the LGA-owned football pitches near the centre of the town, although space is somewhat limited.
Scope
The initial scope of the project includes:
a marketing campaign to promote the event;
a celebrity to open the event;
a website to provide information about the event and handle applications; an event village to support the 'family day out'; the training of LGA staff as volunteers to run and support the event; back-office processes to handle the applications; fundraising to cover the cost of the event.
The project has been set up with four work streams to deliver this work:
1. Marketing
2. Website
3. Event Village
4. Staff Training
Project Background
The LGA have extensive experience in using PRINCE2 and will run the event as a single project. The project manager is fully conversant with PRINCE2 Agile. One office in the LGA building in the centre of town has been given to the project for the entire duration. The office is across the corridor from the Marketing Department and the project manager has already put a sign on the door that says 'Mission Control'.
Timeline
An initial timeline has been suggested and is shown in the following diagram. The timeline may evolve due to the agile ways of working. The timeline shows how work streams are broken down into work packages and/or timeboxes.

Marketing - Additional information
The marketing campaign has two key areas to promote:
1. The event itself including the football tournament, event village and fundraising activities.
2. The LGA's long term aim to improve the fitness of children under the age of 16.
The Marketing Team has received some initial Scrum training but is unsure how it can be applied to their marketing work.
The Marketing Team is keen that the project manager provides them with a clear brief for the campaign before they spend too much time on it.
They have experience of working with a variety of marketing channels, although they are not sure which channel(s) will work most effectively to promote this type of event, and in particular to promote the LGA's longer term health aims.
The Marketing Team is not clear on the priority to assign to the two aims for the event.
The Marketing Team will publish advertisements and/or promotional material every week, with more information in each issue to keep the message up to date.
Nine releases are scheduled at the end of each of the nine week-long timeboxes.
The nine timeboxes within the marketing work stream are scheduled to include:
advertisements:
a radio interview;
production of a hand-out/flyer;
banners and signs to put up around the town and at the event;
the provision of a website and social media content;
promotional posters to be displayed by local businesses.
Using the Project Scenario and Marketing Additional information, answer the following question:
The project manager has agreed that the 'Mission Control' room will have an issue register on the wall for project issues and all teams will display their own issue register on their own team wall as well.
Which BEST explains if this approach is suitable?

  • A. A spreadsheet that all teams have access to would be a more agile way of working.
  • B. The issue registers may be difficult to keep synchronized across the teams so this should be avoided.
  • C. A more formal approach would encourage issues to be raised that might otherwise be missed.
  • D. Each team will be able to physically log and update issues during their daily stand-ups.

Answer: D

Explanation:
Having issue registers displayed on the team walls allows for immediate visibility and encourages team members to log and discuss issues as they arise during daily stand-ups. This promotes a culture of transparency and collaboration, making it easier for teams to manage and address issues in a timely manner.


NEW QUESTION # 26
Project scenario - Get fit with football!
(Note: The companies and people within the scenario are fictional)
Introduction
A Local Government Authority (LGA) has decided to organize a six-a-side football tournament. The tournament will contribute towards achieving the targets set by a national initiative to improve the fitness of children under the age of 16. As part of the LGA's policy of self-funding, this has to be achieved at zero cost to the LGA (and therefore the local tax payer). The cost of the event will be covered through fees paid by teams registered to take part in the tournament, sponsorship and monies raised during the day. Any surplus would be used for the maintenance of local sports centres.
Teams can register under one of several age groups for both boys and girls. In addition, family members are asked to attend to provide support.
This sports event is designed to be a family day out. The football tournament will have an event village including a kidz'-zone, catering, car parking, mobile changing rooms and toilets. The tournament will take place on the LGA-owned football pitches near the centre of the town, although space is somewhat limited.
Scope
The initial scope of the project includes:
a marketing campaign to promote the event;
a celebrity to open the event;
a website to provide information about the event and handle applications; an event village to support the 'family day out'; the training of LGA staff as volunteers to run and support the event; back-office processes to handle the applications; fundraising to cover the cost of the event.
The project has been set up with four work streams to deliver this work:
1. Marketing
2. Website
3. Event Village
4. Staff Training
Project Background
The LGA have extensive experience in using PRINCE2 and will run the event as a single project. The project manager is fully conversant with PRINCE2 Agile. One office in the LGA building in the centre of town has been given to the project for the entire duration. The office is across the corridor from the Marketing Department and the project manager has already put a sign on the door that says 'Mission Control'.
Timeline
An initial timeline has been suggested and is shown in the following diagram. The timeline may evolve due to the agile ways of working. The timeline shows how work streams are broken down into work packages and/or timeboxes.

Marketing - Additional information
The marketing campaign has two key areas to promote:
1. The event itself including the football tournament, event village and fundraising activities.
2. The LGA's long term aim to improve the fitness of children under the age of 16.
The Marketing Team has received some initial Scrum training but is unsure how it can be applied to their marketing work.
The Marketing Team is keen that the project manager provides them with a clear brief for the campaign before they spend too much time on it.
They have experience of working with a variety of marketing channels, although they are not sure which channel(s) will work most effectively to promote this type of event, and in particular to promote the LGA's longer term health aims.
The Marketing Team is not clear on the priority to assign to the two aims for the event.
The Marketing Team will publish advertisements and/or promotional material every week, with more information in each issue to keep the message up to date.
Nine releases are scheduled at the end of each of the nine week-long timeboxes.
The nine timeboxes within the marketing work stream are scheduled to include:
advertisements:
a radio interview;
production of a hand-out/flyer;
banners and signs to put up around the town and at the event;
the provision of a website and social media content;
promotional posters to be displayed by local businesses.
Using the Project Scenario and Marketing Additional Information, answer the following question:
For which marketing product would a quality method of automated test-driven development be MOST suited?

  • A. The text and links for the website.
  • B. The banners for the Event Village.
  • C. The newspaper advertisements.
  • D. The radio interview.

Answer: A

Explanation:
Automated test-driven development (TDD) is particularly well-suited for digital products like website content, where code and links can be continuously tested for functionality and correctness. This approach allows for rapid iterations and ensures that updates do not introduce errors, making it ideal for maintaining the quality of web content.


NEW QUESTION # 27
Project scenario - Get fit with football!
(Note: The companies and people within the scenario are fictional)
Introduction
A Local Government Authority (LGA) has decided to organize a six-a-side football tournament. The tournament will contribute towards achieving the targets set by a national initiative to improve the fitness of children under the age of 16. As part of the LGA's policy of self-funding, this has to be achieved at zero cost to the LGA (and therefore the local tax payer). The cost of the event will be covered through fees paid by teams registered to take part in the tournament, sponsorship and monies raised during the day. Any surplus would be used for the maintenance of local sports centres.
Teams can register under one of several age groups for both boys and girls. In addition, family members are asked to attend to provide support.
This sports event is designed to be a family day out. The football tournament will have an event village including a kidz'-zone, catering, car parking, mobile changing rooms and toilets. The tournament will take place on the LGA-owned football pitches near the centre of the town, although space is somewhat limited.
Scope
The initial scope of the project includes:
a marketing campaign to promote the event;
a celebrity to open the event;
a website to provide information about the event and handle applications; an event village to support the 'family day out'; the training of LGA staff as volunteers to run and support the event; back-office processes to handle the applications; fundraising to cover the cost of the event.
The project has been set up with four work streams to deliver this work:
1. Marketing
2. Website
3. Event Village
4. Staff Training
Project Background
The LGA have extensive experience in using PRINCE2 and will run the event as a single project. The project manager is fully conversant with PRINCE2 Agile. One office in the LGA building in the centre of town has been given to the project for the entire duration. The office is across the corridor from the Marketing Department and the project manager has already put a sign on the door that says 'Mission Control'.
Timeline
An initial timeline has been suggested and is shown in the following diagram. The timeline may evolve due to the agile ways of working. The timeline shows how work streams are broken down into work packages and/or timeboxes.

Event Village - Additional information
The aim of the event village is to provide a range of services and activities for anyone attending the football tournament.
The event village will comprise a number of work packages:
1. Event village design
2. A 'kids-zone' which includes trampolines and swings, as well as the opportunity to try out other sporting activities
3. Stalls which will be sold to local businesses to raise funds for the event:
Refreshment stalls within a large food tent. The LGA is keen to promote the culinary diversity of the town whilst adhering to the objective of eating healthily.
There are 30 vendor stalls selling products related to the event.
The LGA has five stalls to promote their longer term aims and to demonstrate current and future initiatives.
4. A car park for 200 cars.
5. Temporary facilities including changing rooms, toilets and shower facilities.
6. Dismantling of the event village and clean up.
The Event Village Team is assembled using staff from various LGA departments who have no experience of working with agile.
Using the Project Scenario and Event Village Additional information, answer the following question:
The project manager used the Agilometer to assess the prevailing agile environment and, consequently, took action to improve the low score achieved on the 'flexibility on what is delivered' slider.
When should the project manager undertake a further assessment in order to determine if further action is required to increase the slider score?

  • A. Sprint review.
  • B. Sprint retrospective.
  • C. Project retrospective.
  • D. Release retrospective.

Answer: B

Explanation:
The sprint retrospective is an opportunity for the team to reflect on the sprint, discuss what went well, what could be improved, and how to enhance processes moving forward. Assessing the Agilometer score at this point allows the project manager and the team to evaluate the effectiveness of actions taken and make adjustments as needed to improve flexibility in future sprints.


NEW QUESTION # 28
......

For your benefit, UpdateDumps is putting forth you to attempt the free demo and PRINCE2 PRINCE2-Agile-Practitioner Exam Dumps the best quality highlights of the item, Because nobody gives this facility only the UpdateDumps provide this facility. There is no reason to waste your time on a test, Please hurry up and get our PRINCE2-Agile-Practitioner exam dumps which are high-quality and accurate, The advent of our PRINCE2-Agile-Practitioner Exam Questions with three versions has helped more than 98 percent of exam candidates get the certificate successfully. UpdateDumps release the best exam preparation materials to help you exam at the first attempt, Our training materials includePRINCE2-Agile-Practitioner PDF with practice modules, including PRINCE2 Azure as well.

PRINCE2-Agile-Practitioner PDF Questions: https://www.updatedumps.com/PRINCE2/PRINCE2-Agile-Practitioner-updated-exam-dumps.html

Good faith is basic: we are aiming to provide high-quality PRINCE2-Agile-Practitioner: PRINCE2 Agile Practitioner Project Management Exam preparation materials with the best competitive price, we refuse one-shot deal, It is hard to image that how much intellect and energy have been put in PRINCE2-Agile-Practitioner reliable test collection, We feel honored that you trust our PRINCE2-Agile-Practitioner test practice training, If you have any other questions about PRINCE2-Agile-Practitioner PRINCE2 Agile Practitioner Project Management Exam valid study dumps, please contact us by email or online service.

Telling Stories and User Role Modeling, To foreign PRINCE2-Agile-Practitioner spectators, however, this sole focus is rather odd, Good faith is basic: we are aiming to provide high-quality PRINCE2-Agile-Practitioner: PRINCE2 Agile Practitioner Project Management Exam preparation materials with the best competitive price, we refuse one-shot deal.

Pass Guaranteed PRINCE2 - PRINCE2-Agile-Practitioner - Trustable PRINCE2 Agile Practitioner Project Management Exam Latest Test Discount

It is hard to image that how much intellect and energy have been put in PRINCE2-Agile-Practitioner reliable test collection, We feel honored that you trust our PRINCE2-Agile-Practitioner test practice training.

If you have any other questions about PRINCE2-Agile-Practitioner PRINCE2 Agile Practitioner Project Management Exam valid study dumps, please contact us by email or online service, We will offer you the best preparation materials regarding PRINCE2-Agile-Practitioner practice exam.

Report this page